Monday, December 6, 2010

Jack Kyser Dies

RIP: Economists never die, they just lose their equilibrium.


Jack Kyser, the longtime “guru” of the Los Angeles economy, died over the weekend after a long illness. He was 76.

For 25 years as chief economist with the Los Angeles County Economic Development Corp., Kyser was the go-to person for the media, business leaders and elected officials who needed information and analysis of the local economy.

200 Countries over 200 years in 4 minutes

Wednesday, December 1, 2010

Beige Book


Just released from the Federal Reserve.


Some highlights from the 12th District (the entire West Coast).
1. Wages and prices are down. This means that inflation is not an issue. Some exceptions were raw goods such as aluminium and some materials sourced from China, namely apparel.
2.Retail trade for this holiday season will be better than last year by 3-7 percent.
3. Manufacturing demand was up for aircraft and metal fabrication, down for wood products.
4. Agriculture and raw goods extraction demand were up due to the low dollar and strong export demand for corn and livestock.
5. Real estate and construction were down.
6. Financial institutions were down due to consumers continuing to deleverage and the struggling credit quality of some banks.
Overall, this is what the recovery will look like.
If you want to get really depressed, look at the 11th District, where high cotton prices, beef prices and energy prices look more like a "real" recovery.

Wednesday, November 17, 2010

Why it is hard to start a small business

This pretty much sums it up.

Sunday, November 14, 2010

Hotel built in 6 days

Only in China. Of coarse. I am thinking of all the limitations that would prohibit this same feat from occurring in the US. Labor cost would be a major one, as well as the ability to work 24 hours a day. Or meeting all the various construction codes, this would be especially important in terms of what you could and couldn't construct something with. You can't even get an LA building inspector out to the job site in less than 3 days for a preliminary inspection, and then it would be 3 more for a final inspection. Even a single story large concrete box takes 6-8 months out here.

One step I felt was missing, I didn't see them lay the foundation, just drying the concrete would take a day at least.

Tuesday, November 2, 2010

Data Visualisation


This is a pretty fun presentation, I liked the peak break-up times.