Operational Savings:
8-9% decrease in operating costs (Lighting, HVAC)
7-8% increase in building value
6-7% increase in ROI
3-4% increase in occupancy
2-3% increase in rent
Initial Costs:
Additional Construction Costs for LEED-Certified Buildings
Platinum (52-69 LEED Points): 6-7% increased cost
Gold (39-51 LEED Points): 2-3% increased cost
Silver (33-38 LEED Points): 1-2% increased cost
Certified (26-32 LEED Points): 0-1% increased cost
Green Strategies: The LEED system is based on points in a number of categories, some points are easier to obtain than others. It is possible to obtain LEED Certification without major cost and with minor changes in the planning stages of a project.
.bmp)
· Minimizing available parking
· Allocating “preferred” parking for low emission vehicles and van-pools
· Facilitating bike racks
· Water efficient landscaping
· Storage & Collection of Recyclables
· Renewable Building Materials such as wheat-board, bamboo, linoleum etc.
Los Angeles is taking a bold step forward and it is expected that many cities will follow in this footstep. If you are in the development community, you should take some time to familiarize yourself with the whole LEED Certification process; it is not going away any time soon.